The Box Factory is one of the UK’s largest independent manufacturers of corrugated packaging. Established in Leamington Spa in 1992, the company employs more than 100 colleagues and produces over 40 million boxes annually. Its services span packaging design, printing, manufacturing, stockholding and delivery.

The business supplies high-volume, bespoke packaging to sectors including food and drink, pharmaceuticals, FMCG, automotive, retail and industrial manufacturing.

Read their FourJaw story to learn how they identified:

 

 

Growth plans

The business has invested more than £12 million over the past decade, with its latest expansion including a modern 50,000-square-foot distribution hub with capacity for more than 8,000 pallets. By consolidating three warehouse locations, The Box Factory plans to release existing floor space for additional manufacturing capacity, advanced machinery and sustainable infrastructure.

This growth places greater importance on understanding how effectively production equipment is being used.

With high-capacity casemaking, printing, die-cutting and glueing lines producing millions of boxes each year, hidden downtime can affect output, lead times and the company’s ability to realise the value of its continued capital investment.

That made reliable and real-time production data increasingly important to The Box Factory’s next phase of growth.

Production Challenges

Before FourJaw, The Box Factory’s existing production system depended heavily on information entered after a job had finished. Downtime durations were often rounded or recorded retrospectively, making it difficult to distinguish genuine production losses from inaccurate entries.

For example, production jobs frequently run across multiple shifts. Previously, when a morning shift handed a job over to the evening shift, downtime reasons were often added retrospectively by the second shift. Operators could only record the stoppages they knew about, leaving gaps in the data and making it difficult to establish a reliable picture of machine performance.

Managers therefore lacked a sufficiently reliable baseline for deciding which machines, stoppages or improvement projects deserved attention.

Project approach & solution

An initial analysis of production data highlighted the scale of the opportunity. One of the company’s three largest casemaking machines showed an average of 317 minutes, more than five hours, of recorded downtime per day. 

The supporting assessment estimated the associated exposure at approximately £3,000 per machine per week, on one machine over 52 weeks, which could have cost the business more than £150,000 in machine downtime.

Because the original data was not fully reliable, this was treated as an indication of potential loss rather than a confirmed saving. However, it demonstrated the need to capture accurate machine status and downtime reasons as events occurred.

FourJaw data is now built into The Box Factory’s weekly production-management routine, where the team reviews every monitored machine, examining uptime, productive downtime and unproductive downtime to identify recurring losses and opportunities for improvement.

The team combines FourJaw data with information from its existing production systems to compare the hours available with the hours used. This allows it to calculate the capacity that could potentially be recovered if machines ran more efficiently and avoidable downtime was reduced.

Results

FourJaw has enabled The Box Factory to:

  • Establish accurate uptime and downtime baselines.

  • Capture downtime reasons at the point of production.

  • Identify recurring sources of lost production time.

  • Detect emerging stoppages without waiting until the end of a shift.

  • Build credible financial cases for operational improvements

The analysis gave The Box Factory its first clear view of the difference between scheduled hours and genuinely productive machine time. For example:

  • Across an 18-week period, the company’s model identified an average opportunity equivalent to approximately 175,000 additional boxes per week across the monitored machines.

  • The team found one casemaker (they have three in total) averaged over five hours of recorded downtime a day, with an estimated cost of £3,000 a week, or more than £150,000 over a year.

  • The data enabled the team to quantify the capacity potentially available if the identified unproductive time could be recovered at the recorded production rates.

  • The production team was able to move beyond general assumptions about machine performance and can now evaluate individual processes, prioritise the most valuable improvement opportunities and measure whether subsequent changes have produced the intended effect.

The impact extends beyond management reporting. Production information is displayed on screens on the shop floor, giving operators direct visibility of how their machines are performing and how operational changes affect the results.

Rather than performance data being reviewed only after production has finished, operators can see and respond to it as part of their working day. According to Alex, this has increased engagement and encouraged the team to take a more active interest in machine performance.

Summary

The Box Factory now has a far clearer understanding of how its machines are really performing and, crucially, where opportunities exist to recover valuable production capacity.

FourJaw has given The Box Factory a more reliable view of where productive time is being lost across its principal casemaking, die-cutting and glueing equipment.

By replacing incomplete, retrospective downtime reporting with reliable production data, FourJaw has given the team a baseline it can use to identify losses, evaluate improvements and plan more confidently.

That data is now embedded into weekly production reviews and is helping both management and operators understand the impact of changes made on the factory floor.

As Alex explains, the real value has been turning previously hidden performance into something the business can see and act on:

 

“FourJaw has increased production visibility that has allowed us to evaluate processes across the board”.